§ 13.04.070. New water service installation.  


Latest version.
  • Upon satisfaction of the requirement for a new water service installation, the City shall tap the main, insert a corporation cock and run the water service pipe from its connection with the corporation cock to the property line of the property to be serviced and set the water meter at such point; provided, that the City shall at no time furnish more than one hundred (100) feet of such service pipe and in computing the length of the service pipe to be furnished by the City the water main will be assumed to lie in the center of the street regardless of its actual location. The service pipe shall be not less than one inch in size and laid not less than three feet below the surface of the ground or pavement. All service lines shall be copper or approved plastic, at the option of the City. The City shall perform all labor and furnish all materials and apparatus necessary for such installation, and the applicant shall pay the City the charges or fees imposed for installation of water service as set forth in Section 13.04.220.

(Ord. 1266 § 2, 1994: Ord. 1091 § 7, 1982)