§ 15.20.270. Term of permit—Extensions.
All permits required by this chapter shall be issued for a period not exceeding one year from date of issuance, provided, however, such work must be started within six months of date of issuance, or said permit shall be void. Permits issued for less than one year may be extended, at no additional cost, to the maximum total period of one year upon request for such extension; provided further that when the construction is of the nature or size to require longer than one year for construction, the Building Inspector may extend such permit beyond the one-year limit.
(Ord. 1124 § 36, 1986)