§ 5.08.070. Permit to lay pipelines in streets and alleys.
Latest version.
If an applicant or any other party shall desire to lay pipelines in the streets and/or
alleys in the City for transmission of oil and/or gas from any well within the perimeter
of the City, authorization therefor, as provided by law, shall be obtained from the
Governing Body before commencement of drilling of the well, and as a prerequisite
of such authorization, the person, firm or corporation seeking same shall provide
detailed plans and specifications for constructing and maintaining the pipelines and
for restoration, so far as practicable, of streets and alleys, wherever damaged by
such construction, to as good condition as existed immediately prior to the damage,
which plans and specifications shall be approved by the City Manager of the City prior
to granting such authorization.
(Ord. 547 § 7, 1953)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');